Sign in
Download Opera News App

News Politics

 

Politics

 

Africa politics

'Dumsor': GRIDCO to outdoor new timetable for power supply.

The famous power disruption popularly known in Ghana as the Dumsor is gradually creeping into the system again. The energy sector is set to release a new timetable to feature the dumsor program.

In an interview with Joy News, the vice chairman of the mines and energy sector in Parliament, Mr Elvis Donkor confirmed that, the National Grid Company will by next week make available the timetable which will determine the schedules of the dumsor.

He said even though the government is trying its best to sustain power supply to Ghanaians, it is necessary for the nation to go through this scheduled to enable the energy sector supply power to all Ghanaians equally.

Ghanaians have suffered from the Dumsor under the John Mahama administration which have caused the NDC so much in the 2016 Elections as most people voted against them for refusing to address the crisis.

The current administration also boast of being responsible for rectifying the problem. But today, Ghanaians will surely know who actually can fix Dumsor crisis in Ghana.

Kindly leave your comments and thoughts in the comments section below.

Content created and supplied by: Ghananews5 (via Opera News )

Dumsor Elvis Donkor GRIDCO Ghana John Mahama

COMMENTS

Load app to read more comments